Piling on Wilshire Bl between Westwood Blvd and Veteran Av Summary Pile installation continues on Wilshire Bl between Veteran Av and Westwood Bl. The “piles” will support the underground walls for the future Westwood/UCLA Station. Concrete “k-rail” barriers placed on Wilshire Bl protect the public outside of the work zones. Current activities include installation of dewatering wells and geo- technical instruments. Cap beams and walers and dewatering wells are currently being installed over the piles to prepare for decking and station construction. Contractors will be restoring and re-stripping the street in preparation for decking. This work will be completed on a continuous weekend, August 12 through August 15, 2022 from 11pm to 6am. During this work, Wilshire Bl lanes will be restricted to one lane (curb lane) between Malcolm Av and Veteran Av for WB traffic and one lane between Sepulveda Bl and Glendon Av for EB traffic.
Piling in the Center of Wilshire Bl: Work hours:
Traffic Control:
Noteworthy:
Metro Access Metro bus stops may be relocated, or lines could be impacted. For information changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels. |