Wilshire Bl between Veteran Av and Westwood Bl: Installation of Conduits for LADWP Temporary Power
Summary
Contractors will be installing conduits for LADWP temporary power. This work will occur on Wilshire Bl between Veteran Av and Westwood Bl.
When
Date: November 3 to November 30, 2022
Work hours:
Monday to Friday, 11pm to 6am and 9pm to 6am, Phase dependent
Traffic Control:
Phase 1: 11pm to 6am
Phase 2: 11pm to 6am
-
Three eastbound Wilshire Bl lanes will be closed between Westwood Bl and Gayley Av. Reduced lanes begin to be reduced before Veteran Av. -
Both left turn pockets for eastbound Wilshire Bl at Gayley Av will remain open.
Phase 3: 9pm to 6am
-
Two westbound Wilshire Bl lanes will be closed between Glendon Av and Gayley Av. Lanes for westbound Wilshire Bl traffic will begin to get reduced before Glendon Av. -
Both left turn pockets lanes will be closed for eastbound Wilshire Bl traffic at Westwood Bl. -
All eastbound Wilshire Bl lanes will remain open except for the left turn pockets at Westwood Bl.
Phase 4: 9pm to 6am
Noteworthy:
-
Access to driveways, residences & businesses will always be maintained unless notified in advance. -
Access for pedestrians will be maintained outside of construction zones. -
Access for the Fire Department and emergency responders will be maintained. -
Parking restrictions will be implemented in the immediate area of the work zone. -
Construction is dynamic and schedules are subject to change.
Metro Access
Metro bus stops may be relocated or lines could be impacted. For information changes to Metro service, please call 323.GoMetro. Passengers are encouraged to use the Transit App to plan their travels.
|